Devry BSOP429 week 2 Lab

Lab 1 of 6: Lead Times
Note!
Submit your assignment to the Dropbox located on the silver tab at the top of this page.

(See the Syllabus section “Due Dates for Assignments & Exams” for due dates.)

LAB OVERVIEW

Part A: The Scheduling Lab

This week’s Lab assignment consists of two parts: the Scheduling Lab and the Input/Output Report Lab. Please be certain to complete both of them. Use MS Word to copy your tables and answers.

Part A: The Scheduling Lab

Points

Description

Earliest Due Date Schedule15Using data provided to you, complete a table using the Earliest Due Date Scheduling Method.
Critical Ratio Schedule15Using data provided to you, complete a table using the Critical Ratio Scheduling Method.
Total30A quality table will meet the above requirements.

Scenario and Summary

Situation: Jobs A, B, and C are waiting to be started on Machine Center X. When they are finished at this center, they must be moved to Machine Center Y for final processing. Machine capacity for both centers is 40 hours in a 5-day workweek or 8 hours a day. It takes 2 days to move a job from Center X to Center Y.

The following information pertains to the jobs and work centers:

Job

Machine Center X
(hours required)

Machine Center Y
(hours required)

Day Due

A

36

20

10

B

96

24

17

C

60

28

25

Deliverables

Complete a scheduling table for each scheduling technique and determine which job can be completed on time. See the Lab Steps below for directions on how to set up your chart, and then copy your table and answers into an MS Word document.

LAB STEPS

STEP 1: Earliest Due Date Schedule
.equella.ecollege.com/file/a66b045e-90bf-486a-b6f2-4f6b995bccf1/1/BSOP429_W2_Lab.html#top”>Back to Top
Use the data above and complete the following table using the Earliest Due Date Scheduling method. Determine which jobs will be completed on time. Copy your table and answers to an MS Word document.

Machine Center X

Machine Center X

Machine Center X

Machine Center X

Machine Center Y

Machine Center Y

Machine Center Y

Machine Center Y

Job

Start

Days

Done

Move

Start

Days

Done

Due

A

B

C

STEP 2: Critical Ratio Schedule
.equella.ecollege.com/file/a66b045e-90bf-486a-b6f2-4f6b995bccf1/1/BSOP429_W2_Lab.html#top”>Back to Top
Using the above data, complete the following table using the Critical Ratio Scheduling method. Determine which jobs will be completed on time. Copy your table and answers to an MS Word document.

Machine Center X

Machine Center X

Machine Center X

Machine Center X

Machine Center Y

Machine Center Y

Machine Center Y

Machine Center Y

Job

Start

Days

Done

Move

Start

Days

Done

Due

A

B

C

STEP 3: Final Step in Part A
.equella.ecollege.com/file/a66b045e-90bf-486a-b6f2-4f6b995bccf1/1/BSOP429_W2_Lab.html#top”>Back to Top
Submit your completed Lab in an MS Word document for grading. Please provide onlyone document with all responses.

Submit your assignment to the Dropbox located on the silver tab at the top of this page. For instructions on how to use the Dropbox, read these.next.ecollege.com/default/launch.ed?ssoType=DVUHubSSO2&node=node/184″>step-by-step instructionsor watch this.next.ecollege.com/default/launch.ed?ssoType=DVUHubSSO2&node=node/232″>Dropbox Tutorial.

See the Syllabus section “Due Dates for Assignments & Exams” for due date information.

Proceed to Part B: The Input/Output Report Lab
.equella.ecollege.com/file/a66b045e-90bf-486a-b6f2-4f6b995bccf1/1/BSOP429_W2_Lab.html#top”>Back to Top
LAB OVERVIEW

Part B: The Input/Output Report Lab

This week’s Lab assignment consists of two parts: the Scheduling Lab and the Input/Output Report Lab. Please be certain to complete both of them.

Part B: The Input/Output Report Lab

Points

Description

Report Construction10Using data provided to you, complete a table for the Report Construction.
Data Assessment10Using the data and table for the Report Construction, answer questions for the data assessment.
Total20A quality table will meet the above requirements and a quality data assessment will meet or exceed the above requirements.

Scenario and Summary

Situation: The following table contains the input/output data at the end of Week 8 for a work center. The beginning backlog is 50 units.

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Week 7

Week 8

Planned Input

60

60

60

60

60

60

60

60

Actual Input

68

70

75

70

68

60

55

55

Planned Output

65

65

65

65

65

65

65

65

Actual Output

60

62

63

63

64

65

63

60

Deliverables

Use the data from the Situation Table above and complete an Input/Output Report. See the Lab Steps below for directions on how to set up your chart, and then copy your table and answers into an MS Word document.

LAB STEPS

STEP 1: Report Construction
.equella.ecollege.com/file/a66b045e-90bf-486a-b6f2-4f6b995bccf1/1/BSOP429_W2_Lab.html#top”>Back to Top
Use the data from the Situation Table above and use this table for your answers, and then copy your table into an MS Word document.

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Week 7

Week 8

Planned Input

Actual Input

Cumulative Deviation

Week 1

Week 2

Week 3

Week 4

Week 5

Week 6

Week 7

Week 8

Planned Output

Actual Output

Cumulative Deviation

Actual Backlog

STEP 2: Data Assessment
.equella.ecollege.com/file/a66b045e-90bf-486a-b6f2-4f6b995bccf1/1/BSOP429_W2_Lab.html#top”>Back to Top
Copy your answers to the following questions into an MS Word document:
What was the planned objective?
Was the planned objective met?
What recommendation(s) would you make?

STEP