BUS 519 Week 9 Assignment 4 Project Progress
During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place:
1. The top-two (2) threats have occurred.
2. The top opportunity has been realized.
3. The projects risk budget is already exhausted.
4. The risk management schedule has been shortened by two (2) months.
Write a five to seven (5-7) pages spaper in which you:
Analyze the impact of those events on the project.
Determine if any mitigation activities are required and explain why.
Determine if budget / schedule changes are necessary and explain why.
Update the risk register and highlight the changes made. Provide the justification for the changes.
Use at least four (4) quality resources in this assignment.
Note: Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
Include a cover page containing the title of the assignment, the students name, the professors name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.